Manufacturing at Newpeak
Newpeak manufactures beverage filling machines and complete bottling lines in Zhangjiagang, Jiangsu. Manufacturing work combines over 16 years of filling equipment experience with in-house engineering, quality inspection, and service support after delivery.
Plant and Manufacturing Base in Zhangjiagang
Newpeak is based in Zhangjiagang, Jiangsu Province, China, and manufactures beverage filling and packaging machinery. The manufacturing plant covers a total floor space of 4,259 m² and supports work on stand-alone machines and complete bottling lines. Newpeak has over 16 years of experience manufacturing filling equipment and 12 years of export experience. In 2020, Newpeak became a formal member of the China Beverage Machinery Association. The plant produces water bottling machines, filling monoblocks, and related packaging equipment for beverage producers.
R&D Engineers and QA/QC Inspectors
Newpeak’s team includes 10 R&D engineers and 3 QA/QC inspectors. The engineers work on machine layout, component selection, and configuration changes for different bottle sizes, caps, labels, and output requirements. The QA/QC inspectors check incoming parts, machining and assembly work, and finished machines before shipment.The team also supports monoblock filling machines and related equipment where filling, capping, and other steps are combined on a common frame.
How Filling Machines Are Built
Machine building starts from the agreed bottle, cap, label, and process specification. Newpeak’s engineers release drawings and component lists, and the workshop prepares frames, stainless-steel parts, piping, and electrical panels. Assembly covers the filling valves, capping heads, conveyors, and control cabinet. Operators run the machine through dry checks and water trials before shipment. The same workflow applies to beverage filling lines, juice fillers, and carbonated drink fillers within their different process requirements. Changes to layout or output are reviewed during engineering and quality checks before the build proceeds.
Inspection Before Shipment and Lead Times
Before shipment, QA/QC inspectors review dimensions, fittings, electrical connections, guarding, and machine operation. They check that the built machine matches the approved configuration and that labels, switches, and safety covers are in place. Standard Newpeak filling machines are usually delivered within 25–35 days. Customised turnkey production lines take 45–60 days depending on configuration. Lead time is set from the agreed technical details and order arrangement, and any configuration change is reviewed before the build schedule is fixed. Payment is accepted by T/T, L/C, or Alibaba Trade Assurance orders.
Service After Delivery
After delivery, Newpeak provides normal service support for installation, commissioning, operator training, and spare parts. Engineers can review line layout, utility connections, and start-up questions with the customer’s team. When a machine needs attention, service communication covers the fault description, photos or video, and spare-part identification before a solution is agreed. The service team can also discuss adjustments for bottle sizes, labels, and packing formats as production needs change. Customers can use the contact page to discuss a filling machine, a complete line, or service needs.
Request a quotation
Tell us your product, bottle size and target output in bottles per hour.
Or write to sales@bottlefillingsystems.com